Listing of some completed assignments

Gas Turbine Check and Commission

Gas turbine return to service

Stanwell Power Station: Mica Creek

Scope:
- Instrumentation inspection and calibration.
- Vibration system repair.
- GE Mark V control system check.
- Foxboro DCS and ancillary system check.
- Turbine run up and commission assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
September 2018.

Hazardous Area Electrical Upgrade

Fuel gas inlet to turbine

Stanwell Power Station: Mica Creek

Scope:
- Complete gas skid inspection.
- Upgrade equipment.
- Upgrade earthing.
- Upgrade Hazardous Area Dossier.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
August 2018.

Field Instrument Calibrations

Plantwide service during planned maintenance

Air Liquide Oxygen Plant: Port Pirie

Scope:
- Pressure and temperature field calibrations.
- Rectify faults.
- Issue calibration certificates.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
August 2018.

AB Powerflex 753 VSD Supervisory Control Configuration

Fuel Terminal

Mobil Fuel Terminal: Birkenhead

Scope:
- Configure Foxboro DCS to provide supervisory control.
- AB Powerflex 753 used to control load out pump.
- Alarms and displays.
- 98 Premium unleaded fuel.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
July 2018.

GE Gas Turbine Return to Service Engineering and Field Services

Instrumentation Calibration and Control System Test Prior to Return to Service

Stanwell Power Station: Mica Creek

Scope:
- Calibrate gas turbine instruments.
- Completion of inspection and test.
- Adjust control system logic as required.
- Assist in commissioning.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
March 2018.

Energy Consumption, Demand, Billing and Monitoring

Electrical Switchboard Manufacturers

Decon Corporation: Melbourne

Scope:
- Design and construct energy monitoring and analytics information system.
- Installation supervision.
- Configure and install the InformDB Technology Stack.
- Design and deliver display dashboards.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
January 2018.

Clean Room Environmental Monitoring System

Design, Construct and Install an Environmental Monitoring System for Clean Rooms

Zoetis Pharmaceutical: Parkville

Scope:
- Design and construct pharmaceutical clean room monitoring system.
- Factory manufacture.
- Configure and install the InformDB Technology Stack.
- Deliver to GMP requirements.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
November 2017.

Hazardous Area Gas Skid Upgrade

Inspect and Re-Design of Hazardous Area Gas Skid

Stanwell: Queensland

Scope:
- Hazardous area Detailed Inspection for gas feed to power turbine.
- Document findings and redesign to make safe.
- Quality management.
- Commissioning assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
October 2017.

Distributed Control System Migration to ABB Platform

Documentation of Control Loops and Commissioning Assistance

Australian Paper: Maryvale Mill

Scope:
- Document control strategy.
- Create control loop documentation to suit input into ABB DCS.
- Quality management.
- Commissioning assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
September 2017.

Power Station Water Plant Upgrade

Process instrumentation and tubing

Stanwell: Queensland

Scope:
- Install water analyzers.
- Source and install process instrumentation.
- Complete wet rack tubing.
- Commissioning assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
August 2017.

Serial Communications Upgrade

Field wiring for DCS Serial Gateways Upgrade

Stanwell: Queensland

Scope:
- Install and energize control enclosures.
- Run serial cables for all communication gateways.
- Run fibre optic cabling for upgraded communications links.
- Commissioning assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
July 2017.

Plant Air Services Upgrade

Air Compressor and Dryer Electrical Integration

AGL: South Australia

Scope:
- Project management, enclosure manufacture and trades supervision.
- Field ladder and electrical cabling installation.
- Supervisory controls design.
- Integration into the plantwide control system.
- Commissioning assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
June 2017.

Stack Emissions Monitoring

Gas turnbine emissions measurement and reporting

Citic Pacific: Western Australia

Scope:
- Addition of 6 more emissions stacks expanding our February 2016 installation.
- Project management, server configuration and supply, emissions information systems.
- Hourly, daily and monthly emissions reports using the informDB Technology Stack.
- Communications and interfacing to the ABB gas analyzers.
- Linkage to the plantwide control systems.
- Quality documentation including drawings.
- On site commissioning.

Safety:
-Zero Lost Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
May 2017.

Shutdown Services

Major shutdown services - ammonium nitrate production plant

Incitec Pivot Limited - Dyno Nobel Moranbah Queensland

Scope:
- DCS and Safety Instrumented System (SIS) proof checking.
- Maintenance and update of quality test sheets and records.
- Rectification and update works where required.
- Hazardous area.
Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
April 2017.

Fuel Oil Tank Facility

Radar level integration via wireless network to plantwide control system

AGL: South Australia

Scope:
- Project management, enclosure manufacture and trades supervision.
- Field conduit and electrical cabling installation.
- Electrical design for radar gauge level automation.
- Hazardous area design and installation.
- Drawing office completion.
- Custom mechanical instrument stand and cable way manufacture.
- Commissioning assistance.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
February 2017.

Liquid CO2 Production Plant

Electrical and instrument integration for CO2 gas collection.

Air Liquide: South Australia

Scope:
- Project management, enclosure manufacture and trades supervision.
- Field ladder and electrical cabling installation.
- Manufacture and supply of MCC and field switchboards.
- Electrical design for field valve automation.
- Commissioning assistance.

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
December 2016.

Pump Station MCC

Outdoor salt water pumping station MCC

Air Liquide: South Australia

Scope:
- Design completion and fitout.
- Manufacturing supervision of the custom stainless steel 3 bay enclosure.
- In factory fitout of PLC, VSD, air conditioner and switchgear.
- In factory MCC electrical wiring.
- In field installation and quality check prior to power up.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
December 2016.

Power Turbine Control Integration

Linking 3 power turbine generators to the existing plantwide control system.

Stanwell: Queensland

Scope:
- Project management, control system engineering, cabling, terminations and trades supervision.
- Fiber optic installation and termination.
- Relay protection system automation.
- Linking existing skid mounted power generator AB controls to the Foxboro plantwide DCS.

Safety:
-Zero Lost Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
December 2016.

Water Treatment Plant

Demineralisation plant control system and cabling upgrade.

AGL: South Australia

Scope:
- Legacy control system documentation and upgrade (Siemens platform).
- Addition of a touch screen user interface.
- Project management, enclosure manufacture, control system design and trades supervision.
- Enhanced communications via fibre optic installation.

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
May 2016.

Power Station GPS Synchronized Timecode

GPS time synchronization receiver installed and connected to the Plant Wide control system

Stanwell: Far North Queensland power station

Scope:
- Design and issue drawings.
- Procure equipment, stage and test.
- Design lightning protection circuits and select equipment.
- Complete a site installation and quality plan.
- Install GPS receiver and lightning arrestors on site, run cabling to Plant Wide control system.
- Configure software in control system to synchronize time automatically.
- Test and hand over

Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
March 2016.

Stack Emissions Monitoring

Gas turnbine emissions measurement and reporting

Citic Pacific: Western Australia

Scope:
- Project management, server configuration and supply, emissions information systems.
- Hourly, daily and monthly emissions reports using the informDB Technology Stack.
- Communications and interfacing to the ABB gas analyzers.
- Linkage to the plantwide control systems.
- Quality documentation including drawings.
- On site commissioning.

Safety:
-Zero Lost Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
February 2016.

Gold Mine - Engineering Assistance

Assistance with Foxboro plant wide control system configuration

Cardno / Newcrest Mining: Papua New Guinea, New Ireland Province (Lihir Island)

Scope:
- Control system engineering assistance.
- Foxboro I/A Series Distributed Control System.
- Specification and configuration changes.

Safety:
-Zero Lost Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
Ongoing.

Gas Plant - Emissions Monitoring

Oil & Gas processing emissions monitoring

Exxon: Longford Gas Processing Plant

Scope:
- Project management, server configuration and supply, emissions information systems.
- Hourly, daily and monthly emissions reports using the informDB Technology Stack.
- Communications and interfacing to the ABB gas analyzers.
- Linkage to the plantwide control systems.
- Quality documentation including drawings.
- On site commissioning.

Safety:
-Zero Lost Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
Factory testing February 2016. Commissioning December 2016

Control Room Upgrade

Exxon: Fuel Terminal South Australia

Scope:
- Project management, electrical design, network design and trades supervision.
- Cabling and Fibre optic installation.
- Manufacture and supply of server rack.
- Upgrade of workstation software.
- Commissioning.
- Training

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
June 2015.