Major Assignments

Plant Air Services Upgrade

Air Compressor and Dryer Electrical Integration

AGL: South Australia

Scope:
- Project management, enclosure manufacture and trades supervision.
- Field ladder and electrical cabling installation.
- Supervisory controls design.
- Integration into the plantwide control system.
- Commissioning assistance.

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
June 2017.

Stack Emissions Monitoring

Gas turnbine emissions measurement and reporting

Citic Pacific: Western Australia

Scope:
- Addition of 6 more emissions stacks expanding our February 2016 installation.
- Project management, server configuration and supply, emissions information systems.
- Hourly, daily and monthly emissions reports using the informDB Technology Stack.
- Communications and interfacing to the ABB gas analyzers.
- Linkage to the plantwide control systems.
- Quality documentation including drawings.
- On site commissioning.

Safety:
-Zero Loss Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
May 2017.

Shutdown Services

Major shutdown services - ammonium nitrate production plant

Incitec Pivot Limited - Dyno Nobel Moranbah Queensland

Scope:
- DCS and Safety Instrumented System (SIS) proof checking.
- Maintenance and update of quality test sheets and records.
- Rectification and update works where required.
- Hazardous area.
Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
April 2017.

Fuel Oil Tank Facility

Radar level integration via wireless network to plantwide control system

AGL: South Australia

Scope:
- Project management, enclosure manufacture and trades supervision.
- Field conduit and electrical cabling installation.
- Electrical design for radar gauge level automation.
- Hazardous area design and installation.
- Drawing office completion.
- Custom mechanical instrument stand and cable way manufacture.
- Commissioning assistance.

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
February 2017.

Liquid CO2 Production Plant

Electrical and instrument integration for CO2 gas collection.

Air Liquide: South Australia

Scope:
- Project management, enclosure manufacture and trades supervision.
- Field ladder and electrical cabling installation.
- Manufacture and supply of MCC and field switchboards.
- Electrical design for field valve automation.
- Commissioning assistance.

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
December 2016.

Pump Station MCC

Outdoor salt water pumping station MCC

Air Liquide: South Australia

Scope:
- Design completion and fitout.
- Manufacturing supervision of the custom stainless steel 3 bay enclosure.
- In factory fitout of PLC, VSD, air conditioner and switchgear.
- In factory MCC electrical wiring.
- In field installation and quality check prior to power up.

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
December 2016.

Power Turbine Control Integration

Linking 3 power turbine generators to the existing plantwide control system.

Stanwell: Queensland

Scope:
- Project management, control system engineering, cabling, terminations and trades supervision.
- Fiber optic installation and termination.
- Relay protection system automation.
- Linking existing skid mounted power generator AB controls to the Foxboro plantwide DCS.

Safety:
-Zero Loss Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
December 2016.

Water Treatment Plant

Demineralisation plant control system and cabling upgrade.

AGL: South Australia

Scope:
- Legacy control system documentation and upgrade (Siemens platform).
- Addition of a touch screen user interface.
- Project management, enclosure manufacture, control system design and trades supervision.
- Enhanced communications via fibre optic installation.

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
May 2016.

Power Station GPS Synchronized Timecode

GPS time synchronization receiver installed and connected to the Plant Wide control system

Stanwell: Far North Queensland power station

Scope:
- Design and issue drawings.
- Procure equipment, stage and test.
- Design lightning protection circuits and select equipment.
- Complete a site installation and quality plan.
- Install GPS receiver and lightning arrestors on site, run cabling to Plant Wide control system.
- Configure software in control system to synchronize time automatically.
- Test and hand over

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
March 2016.

Stack Emissions Monitoring

Gas turnbine emissions measurement and reporting

Citic Pacific: Western Australia

Scope:
- Project management, server configuration and supply, emissions information systems.
- Hourly, daily and monthly emissions reports using the informDB Technology Stack.
- Communications and interfacing to the ABB gas analyzers.
- Linkage to the plantwide control systems.
- Quality documentation including drawings.
- On site commissioning.

Safety:
-Zero Loss Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
February 2016.

Gold Mine - Engineering Assistance

Assistance with Foxboro plant wide control system configuration

Cardno / Newcrest Mining: Papua New Guinea, New Ireland Province (Lihir Island)

Scope:
- Control system engineering assistance.
- Foxboro I/A Series Distributed Control System.
- Specification and configuration changes.

Safety:
-Zero Loss Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
Ongoing.

Gas Plant - Emissions Monitoring

Oil & Gas processing emissions monitoring

Exxon: Longford Gas Processing Plant

Scope:
- Project management, server configuration and supply, emissions information systems.
- Hourly, daily and monthly emissions reports using the informDB Technology Stack.
- Communications and interfacing to the ABB gas analyzers.
- Linkage to the plantwide control systems.
- Quality documentation including drawings.
- On site commissioning.

Safety:
-Zero Loss Time Injuries.
-Zero Medical Treatment Injuries.

Completion:
Factory testing February 2016. Commissioning December 2016

Control Room Upgrade

Exxon: Fuel Terminal South Australia

Scope:
- Project management, electrical design, network design and trades supervision.
- Cabling and Fibre optic installation.
- Manufacture and supply of server rack.
- Upgrade of workstation software.
- Commissioning.
- Training

Safety:
- Zero Loss Time Injuries.
- Zero Medical Treatment Injuries.

Completion:
June 2015.